What we did
A vessel's deck crane at Ras Al Khaimah port had operating faults that were holding up cargo work.
We worked through the electrical and control circuits, inspected and tested the safety interlocks and control components, fixed the faults found and fine-tuned the system settings.
The crane was then tested under working conditions and verified as running safely and smoothly.