Load testing Port of Fujairah Oct 2026

Load test of two deck cranes

We inspected and load tested two deck cranes in grab and hook modes, so both could be certified for continued cargo work.

What we did

Two deck cranes on the starboard side of a vessel, forward and aft, were due for load testing and certification at the Port of Fujairah.

Before any load went on, we carried out a visual check of the structure, ran every crane function and inspected the luffing, closing and holding wire ropes.

Each crane was then proof loaded in both of its operating modes: grab mode and general hook mode.

Both cranes held the proof loads steadily and passed, and were certified for service.

Request a quote

Equipment down, or a job to plan? Send photos and the nameplate.

An engineer reads every request and replies within one working day with questions, a site visit or a proposed scope. Anywhere in the UAE.

  • Photos, drawings and PDFs welcome
  • Class-witnessed tests
  • All seven emirates
Crane control valve block and hoses at the operator station