A vessel at Fujairah anchorage needed all of its critical lifting equipment inspected and load tested.
The scope covered the hose handling crane, the provision crane, the engine room crane, the portable gangway and the accommodation ladder.
Each item had an inspection and function checks, then a load test with calibrated test weights under an approved procedure.
The work was finished without interrupting the vessel's operations.