Hydraulic repair UAE May 2026

Shark jaw control valve fault traced and fixed on board

With the vessel due to sail within 48 hours and no quick spares, we built a bypass system that restored the shark jaw's normal and emergency operation.

What we did

A vessel's shark jaw was not working properly. Our inspection found significant internal leakage in both the main pilot-operated directional control valve and the solenoid valve.

Replacement valves from the maker had long lead times, and the vessel was due to sail within 48 hours.

Our technician designed a stand-alone bypass system from locally available components and fitted it on board.

The new setup restored both normal and emergency operation, and the vessel sailed on time.

Request a quote

Equipment down, or a job to plan? Send photos and the nameplate.

An engineer reads every request and replies within one working day with questions, a site visit or a proposed scope. Anywhere in the UAE.

  • Photos, drawings and PDFs welcome
  • Class-witnessed tests
  • All seven emirates
Crane control valve block and hoses at the operator station